Risk register template, with a scoring key and a filled example
A free risk register template in Excel, with scoring formulas, a heat map and 14 filled example rows for hotels, venues, care homes and attractions.
A risk register is a list of the things that could go wrong (or go better than planned) in an organization, with what is being done about each one and who is responsible. It is the document a manager opens before a season starts, an insurer asks about at renewal, and a new general manager reads in the first week.
This template is a working register in one Excel file, set up for operators whose guests, residents and staff share the same spaces: hotels, resorts, spas, ski areas, attractions, senior living residences and event venues. It works in Excel, Google Sheets and Numbers. It comes with 14 filled example rows, a scoring key, a live heat map and drop-down lists, and it prints on letter paper. The rest of this page explains each column, how to score a risk, how to fill in a first register, and the mistakes that most often make a register useless.
What is in the file
The workbook has five tabs:
- How to use. A one-page summary of this guide, so the file makes sense on its own when it is passed around.
- Register. One row per risk, with formulas filled in for 200 rows. The score, rating, residual score, residual rating and next review date work themselves out. Dates that have passed on an open risk turn orange, and closed risks turn grey.
- Scoring key. What each number from 1 to 5 means for likelihood and for impact, and what each rating calls for. It is written for a mid-sized operator. Change the wording and the dollar amounts before scoring anything.
- Heat map. Two five-by-five grids that count the open risks by likelihood and impact, one before further action and one after. They update as the register changes, and there is a reference grid with the score in each cell.
- Lists. The choices in the Category and Status drop-downs. Add or rename categories here, and the drop-down follows.
The example rows are fictional. They are there to show how a filled register reads, and they should be deleted or rewritten before the register is used.
The columns, and what each is for
ID. A short, permanent reference such as R-01. Risks get mentioned in meeting minutes, incident reports and emails, and an ID survives a change of wording. Never reuse an ID, even after a risk is closed.
Risk. A short name that anyone in the organization would recognize: “Guest slips on wet floors at pool and shower exits”. Name the event, not the topic. “Pool safety” is a topic and can’t be scored. A slip at the shower exit can.
Cause and consequence. One or two lines on why it could happen and what would follow. Writing the cause makes the controls obvious. Writing the consequence makes the impact score easier to agree on. If two people describe the same risk with different causes, it is probably two risks.
Category. A broad group such as guest safety, staff safety, security, food safety or technology. Categories make the register sortable, and they show where risks cluster. The template starts with 14; trim the list to the ones that apply.
Site or area. The property, building or department. For a group with several sites, this is what lets the same risk be compared across them.
Owner. One person, named by role. The owner does not have to fix the risk alone, but they are the person who answers for it at a review. A risk owned by “management” or by a committee has no owner.
Likelihood and impact. Each scored from 1 to 5 using the Scoring key, as things stand today with the controls already in place. The next section covers how.
Score and rating. Likelihood multiplied by impact, from 1 to 25, and the band it falls in: Low (1 to 4), Medium (5 to 9), High (10 to 14) or Very high (15 to 25). Both are formulas. The rating is written out in words as well as shown in colour, so a register printed in black and white still reads correctly.
Controls in place. What already reduces the risk, specifically: “Floor checks every hour, logged on a sheet at the pool desk”, not “Regular inspections”. A control that nobody could check is not worth listing.
Further action (who). What will be done to lower the risk further, and who will do it. If nothing will be done, say so and say why. “None. Within tolerance with current controls” is a decision. A blank cell is not.
Action due. The date the further action should be finished. It turns orange once it has passed on a risk that is still open.
Residual likelihood and residual impact. The same two scores again, assuming the further action is done. The gap between the score and the residual score is what the action is worth. If the residual score is the same as the score, the action probably does not address the cause.
Status. One of four: Treating (further action under way), Watching (no action now, but the owner keeps an eye on it), Accepted (within what the organization is willing to accept, with the reason written in Further action), or Closed (the activity or hazard no longer exists). Keep closed rows. They show what was dealt with, and when.
Last reviewed and next review. The date the owner last looked at the risk, and the date it is due again. The next review is set from the rating: a month for High and Very high, three months for Medium and six months for Low. Type over it to choose a different date.
Incidents since last review. How many incidents linked to this risk have happened since it was last reviewed. This is the column that keeps the register honest, and it is covered further down.
How to score a risk
Scoring turns a long list into an order of work. The Canadian Centre for Occupational Health and Safety (CCOHS) describes risk as a combination of how likely harm is and how severe it would be, and notes that clearly defined scales for both make it easier to decide what to deal with first. The template uses a five-point scale for each, multiplied together.
Likelihood is how often it could happen here, given the controls in place today. The key describes each step in plain terms: 1 is “has not happened here in many years”, 3 is about once a year, and 5 is monthly or more often. Use the organization’s own history first, then what is known to happen at similar operations.
Impact is the most likely serious outcome if it does happen, not the worst imaginable one. The key has four columns: people, money, operations and reputation. Read across the row and use the highest column that applies. A water leak that closes three rooms for a week may score 2 for people but 3 for operations, so it scores 3.
A few rules keep scores consistent:
- Score as things are, not as they should be. If the hourly floor check is on paper but often skipped, the likelihood should reflect that.
- Score with more than one person. Ask the owner and someone who does the work every day. A housekeeper and an executive housekeeper often score the same lifting risk differently, and the conversation is useful.
- Use one key for every site. If one property’s 3 is another property’s 5, the register can’t be compared across sites. Agree the key once, at group level.
- Do not argue over one point. The score sets the order of work and the review frequency. Whether a risk is a 9 or a 12 matters less than whether someone owns it and the controls are real.
The bands decide what happens next. Very high means the owner acts now and leadership is told. High means further action with an owner and a due date. Medium means checking that the controls work and acting where it is cheap to do so. Low means accepting or watching it. The Scoring key tab lists these in full, and they are a starting point to adjust to what the organization is willing to accept.
A filled example
The first example row in the template is a risk that most hotels, spas, pools and recreation centres share:
- ID: R-01
- Risk: Guest slips on wet floors at pool and shower exits
- Cause and consequence: Water tracked from showers and the pool deck onto tile; a fall can cause a head or hip injury and a liability claim.
- Category and site: Guest safety, pool and change rooms
- Owner: Operations manager
- Likelihood and impact: 4 (likely, several times a year) and 3 (moderate, medical treatment possible), for a score of 12, High
- Controls in place: Wet-floor signs; floor checks every hour, logged on a sheet at the pool desk
- Further action: Anti-slip matting at every shower exit, by the facilities lead, due December 15
- Residual: Likelihood 2, impact 3, for a residual score of 6, Medium
- Status: Treating. Last reviewed November 2, next review February 1
- Incidents since last review: 3
Read across the row and the story is clear. The risk is rated High because slips are happening several times a year despite signs and checks. The matting addresses the cause (water on tile) and not just the warning, so it should lower the likelihood but not the impact; a fall is still a fall. Three incidents since the last review supports the High rating. If the matting goes in and the incident count drops to zero over the next two reviews, the owner can lower the likelihood with evidence behind it.
Compare R-07 in the template, a guest hurt on a lift or ride because of an equipment fault. It scores 10 (unlikely, but severe) and is marked Accepted, with the reason written in: within tolerance with daily inspections, maintenance on the manufacturer’s schedule, and trained operators. Accepting a risk is a valid decision when it is recorded with a reason and reviewed on schedule.
How to build a first register
- Start from what has already happened. Read the last year or two of incident reports, insurance claims, guest complaints and workers’ compensation claims. Every repeat is a risk. This also gives each likelihood score a basis in fact.
- Walk each site with the people who work there. Ask a lift operator, a housekeeper, a cook or a care aide what they worry about on a busy day. They see near misses that never get reported.
- Go through the categories. Use the Category list as a checklist to catch what the first two steps missed: technology, suppliers, staffing, privacy and money.
- Write each risk as an event. One row per thing that could happen. Split a broad risk into specific ones where the causes, owners or controls differ.
- Score, then sort. Fill in the scores, sort by score, and spend the first review on the High and Very high rows.
- Give every row an owner and a review date before the meeting ends. A risk without both will not be looked at again.
A first register does not need to be complete. It is better to start with the risks that matter most and add to it at each review than to wait for a perfect list.
When choosing further actions, CCOHS recommends working through the hierarchy of controls, from the most effective to the least: remove the hazard, substitute something less hazardous, engineer it out, change how the work is done, and only then rely on personal protective equipment. A register full of “remind staff” and “signs” is leaning on the weakest controls.
Keeping it alive
A register that is filled in once and filed is not a risk register. It is a snapshot. CCOHS calls it good practice to review risk assessments regularly to make sure the controls are working, and to check that changes in the workplace have not introduced new hazards or made old ones more serious.
Three habits keep a register current:
- Review on schedule. The next review dates in the template come from the rating. Sort by next review before each meeting and go through what is due.
- Review after incidents. When an incident happens, find the risk it belongs to, add it to the incident count and ask whether the likelihood is still right. A risk rated unlikely that keeps happening was rated wrong. If an incident fits no risk in the register, a risk is missing.
- Review when something changes. A new site, a new service, a renovation, a new supplier or a change in staffing can each add risks or change old ones. CCOHS also recommends assessing risk before new processes or changes to existing ones are introduced.
A register can also hold opportunities, such as opening a new site or launching a service. Those carry risks of their own, and recording them in the same register keeps the plan and its risks in one place.
Common mistakes
- Topics instead of risks. “Health and safety” or “IT” can’t be scored or owned. Name the event.
- No owner, or a shared one. If a risk belongs to everyone, nobody reviews it.
- Vague controls. “Training” and “regular checks” can’t be verified. Say which training, how often, and where it is recorded.
- Scoring the worst case every time. If every risk scores 5 for impact, the register can’t tell what to do first.
- Residual scores with no action behind them. A residual score is only meaningful if the further action has an owner and a date.
- Every site with its own copy. Separate files drift apart, and a group can’t see that the same risk is High at three properties.
- Never linking to incidents. Ratings set at a workshop and never checked against what actually happens slowly stop describing reality.
- Deleting closed risks. Closed rows are the record of what was dealt with. Keep them.
When a spreadsheet stops being enough
A spreadsheet register works well for one site, one owner of the file and a few dozen risks. It gets harder as the organization grows. Copies drift between sites. The incident count is typed in by hand, so it depends on someone reading every report. Nobody is reminded when a review is due. And the history of why a rating changed lives in old versions of the file, if anywhere.
Riskr is risk management software built around that problem. Its risk register holds every risk on one screen, grouped from broad categories down to specific risks, and rated on the same scale. Each risk has an owner, and people see the risks assigned to them. Every incident reported through Riskr’s incident reporting is linked to a risk, so if a risk rated unlikely keeps happening, the risk team sees it, and the ratings can be compared across sites and over time. Riskr keeps the history of each risk and the reasons behind each decision, and it tracks opportunities and strategic risks in the same register.
The template on this page stays free to use either way. Running a register in a spreadsheet for a few review cycles is also the best way to learn which columns, categories and scores matter before moving them into software. The free incident report form template pairs with it: the form records what happened, and the register is where each incident gets counted against the risk it belongs to.